Redesigned an existing process which was losing nearly £200,000 a year for the company by introducing the raw ingredients in a different way and designing a new piece of equipment to meter in the ingredients. I was recognized and won an award for removing the issue/problem and also made a massive difference for the site by being able to plan the line to run and being confident in the line being able to run.
Comments