We upgraded a water treatment works in a remote part of Moray. The existing electrical supply was not big enough to run all the new equipment so I designed a control system that only let certain things be powered at the same time. For example the heating all went off when two large pumps ran. This meant we could use the same electricity supply saving Scottish Water thousands of pounds.
Comments