My least favourite project was probably one where I was carrying out topsoil calculations. We were trying to reduce the cost of the project, so looking where we could reuse topsoil elsewhere in the project, however we needed to calculate how much we would need and how much would be generated from the construction. It was really quite monotonous calculations.
However, all jobs come with downsides, it can’t all be glitzy glamour every day – sometimes we do have to just get on with some necessary but dull aspects.
Comments